Author(s)
K. Staheli U. S. Corps of Engineers
Free download for members HERE.
L41024 Installation of Pipelines Beneath Levees Using Horizontal Directional Drilling
Author(s)
K. Staheli, D. Bennett, T. Hurley, H. W. O'Donnell
Research Contractor
U. S. Corps of Engineers
Release Date:
04/01/1998
Number Of Pages
210
Catalog No:
L41024
DOI No:

The objectives of the research are to develop guidelines for installing pipelines beneath rivers and within levee right-of-way using HDD techniques, without endangering the levees, and to demonstrate that these techniques offer substantial economic and operational advantages over current practices.

The objectives of the research are to develop guidelines for installing pipelines beneath rivers and within levee right-of-way using HDD techniques, without endangering the levees, and to demonstrate that these techniques offer substantial economic and operational advantages over current practices.

Read More
Research Category:
Directional drilling
Project
Technical Committee